Project
St Johns

Get in touch

We'd love to hear your vision for your property

Location:

Colchester

Duration:

12 weeks

Project
details

We was instructed by the client to build a new timber frame extension above existing dinning room which he had designed. He required the project completed ASAP and we managed to get started 2 weeks from our initial introduction. The extension was a standard timber frame build finished in Pearl grey Harrow plank which TLC have completed on many occasions. The internal area was a bathroom extension which we completed with free standing bath, his and her basins and a large aqualisa walk in shower to give amazing boutique style bathroom. Whilst working on the property we also installed new goal post steels design by our structual engineer and the natal new white 3 pane aluminium bi fold doors.
Client is over the moon with the project and we have built good relationships and looking forward to working with them in the future.

Before
& after
 

Drag the slider to reveal what this project looked like before and after our work

Make an enquiry